31) Developed Project:
Increased capacity of Los Bronces Industrial Plant, 10000 A @ 70 V.
Client: Anglo American (2006)
32) Developed Project:
Rectifier 18000 A DC, 80 V DC 1 Unit of 6 Beats. Reengineering from an existent non controlled rectifier equipment (diodes) and refurbishment of the power transformer. ENAMI, Las Ventanas refinery.
Client: Enami (2006)
33) Developed Project:
Transformer Rectifier 18.500A @ 180V and Emergency Rectifier System and Division for Codelco, El Teniente division, Chile.
Client: Codelco Chile División El Teniente (2004)
34) Developed Project:
Transformer Rectifier 30.000A @ 220V with filter system. Haldeman Mining Company.
Client: Haldeman (2004)
35) Developed Project:
Uncontrolled Rectifier for traction 350kW, 275Vcc.
Client: Codelco, División Chuquicamata (2003)
"Among its main activities there is the development, manufacture, marketing and technical support for equipment and systems with integration technology in the field of power electronics". |
|
36) Developed Project:
Power Rectifier system 2x6.000A/110V. ENAMI El Salado plant.
Client: Enami (2003)
37) Developed Project:
Client: Codelco, El Teniente (2003)
38) Developed Project:
Rectifier 2x25.000 A (50,000 A) DC 152 V DC 2 Parallel Units of 25,000 A. Disputada de Las Condes Mining Company, Los Bronces area, forced water-cooled equipment.
Client: Anglo American (2002)
39) Developed Project:
Controlled Rectifier of 12000 A - DC. ENAMI. Ventanas’ Refinery Expansion Project Equipment cooled naturally.
Client: Enami (1997)
40) Developed Project:
Controlled Rectifier of 12000 A -60 V DC. Ventanas’ Refinery Expansion Project, Enami. Forced water-cooled equipment.
Client: Enami (1997)
|